The excavator is the most versatile and widely deployed machine in construction. It digs foundations, trenches, and drainage channels. It loads trucks, breaks concrete, drives piles, grades slopes, and handles materials. No other single machine performs as many distinct tasks on an active construction site, and no other machine is as consistently present across every phase of civil engineering and building work, from the first cut into the ground to the final site tidy up. The machine it is most often compared with is the bulldozer, a comparison explained in Bulldozer vs Excavator: Key Differences and Uses.
Operating an excavator correctly is a skill that takes time, practice, and formal training to develop. The machine’s combination of 360 degree slewing, simultaneous multi axis hydraulic control, and the precision required for productive and safe digging makes it one of the more demanding machines to operate well. But the foundation, the pre use inspection, the basic controls, the correct sequence for digging and loading, the safety rules that protect the operator and everyone around the machine, is learnable, and this guide sets it out systematically.
This guide covers the complete process of operating a crawler excavator: the pre use inspection, the machine’s controls and their functions, the step by step procedure for digging and loading, travelling on site, working on slopes, and the safety requirements that apply throughout every operating session.
Excavator Operator Certification
Before addressing the mechanics of how to operate an excavator, the most important point must be stated clearly: operating an excavator without appropriate training and certification is prohibited under workplace safety legislation in most jurisdictions and is a direct cause of preventable incidents.
Excavator operator certification is a structured training process through which operators learn not just how to move the controls, but why correct technique matters, why an excavator can tip when travelling on a slope with the boom extended, why the blind spots around the machine are where the most serious incidents occur, why the bucket must be curled before the boom is raised, and why ground assessment before positioning the machine is not optional.
In Singapore, excavator operators are expected to be trained and assessed as competent through an accredited course before operating on a worksite, and employers must make sure every operator is competent for the machine and the task. The Workplace Safety and Health Council and the Ministry of Manpower’s Workplace Safety and Health guidance set out the current framework and training requirements, and should be checked for the latest details before enrolling or deploying an operator.
This guide is a practical operational reference for trained and certified operators, and a preparation resource for those undertaking initial certification training. It does not replace formal certified training.
Also read: Types of Excavators for Construction and Earthmoving
Understanding the Excavator’s Controls

The crawler excavator is controlled through two joysticks, one in each hand, and two foot pedals or levers for the tracks. Most excavators use the ISO control pattern, which in some markets is also called the SAE pattern, while some machines can be switched to a backhoe style pattern that swaps the boom and stick functions between the two joysticks. Always confirm the control pattern of an unfamiliar machine before operating it, since assuming the wrong pattern causes serious operating errors.
Under the ISO pattern:
- Left joystick
Controls the upper structure slew (left and right rotation of the superstructure) and the dipper arm (stick), push forward to curl the stick out, pull back to curl the stick in. Moving the joystick left or right slews the superstructure left or right.
- Right joystick
Controls the boom (up and down) and the bucket, pull back to raise the boom, push forward to lower the boom. Moving the joystick left curls the bucket in (closes the bucket), moving it right curls the bucket out (opens or dumps the bucket).
- Left foot pedal
Controls the left track travel, forward and reverse.
- Right foot pedal
Controls the right track travel, forward and reverse. Pressing both pedals forward simultaneously drives the machine forward in a straight line; pressing both backward reverses the machine. Pressing one forward and one backward spins the machine on the spot.
- Thumb controls and auxiliary circuits
Most excavators have additional thumb buttons or switches on the joysticks controlling the horn, the auxiliary hydraulic circuit (for attachments such as hydraulic breakers), and, on some models, the quick coupler for attachment changes.
The simultaneous, coordinated use of both joysticks to achieve smooth, efficient digging technique, curling the bucket while bringing the stick in while raising the boom in a single fluid motion, is the skill that separates a productive operator from an inefficient one, and it comes only with practice.
The Excavator Operating Procedure, Step by Step
The following steps cover the complete operating procedure for a crawler excavator, from pre use inspection before the first operation of the shift to correct shutdown at the end. Each step must be followed in sequence.
Pre Use Inspection
No excavator should be operated without a pre use inspection completed by the operator before each shift. The inspection identifies defects that have developed since the last use and prevents those defects from causing incidents during operation.
- Undercarriage and tracks
Walk around the machine and inspect the tracks for damaged track pads, broken links, correct tension, and missing track shoes. Check the sprocket and idler wheels for damage and excessive wear. Loose or damaged tracks are a significant safety risk, the machine can shed a track during travel or operation, causing loss of control.
- Hydraulic system
Inspect all visible hydraulic hoses, cylinders, and fittings for leaks. Check the hydraulic oil level in the reservoir. Hydraulic leaks on an operating machine create fire risk from oil contacting hot exhaust components, and cause progressive loss of control capability as hydraulic pressure drops.
- Boom, stick, and bucket
Inspect the boom and stick structural members for cracks and deformation. Check the bucket teeth, worn or missing teeth reduce digging efficiency and should be replaced before the teeth wear back to the adaptor. Check all bucket pins and retaining clips, a pin failure during operation drops the bucket unexpectedly.
- Engine compartment
Check engine oil, coolant level, and fuel level. Check the air filter restriction indicator if fitted. Inspect the engine compartment for oil leaks, coolant leaks, and any debris accumulation near hot exhaust components.
- Cab and controls
Enter the cab and confirm that all controls move freely and return to neutral. Test the horn. Confirm that all warning indicators on the instrument panel are clear, no fault codes, no warning lights. Adjust mirrors to give maximum visibility around the machine.
- Record the inspection
Log the findings in the pre use inspection record. Any defect that affects safe operation must be reported and the machine must be taken out of service until rectified. The same inspection discipline applies across all categories of heavy plant, and the wider principles are covered in the safety guide later in this article.
Starting and Warming Up
Start the engine with the joysticks in neutral and the travel controls at rest. Allow the engine to idle for a few minutes, as the manufacturer recommends, before applying load to the hydraulic system. Cold hydraulic oil is thick and does not flow efficiently through the system’s small orifices and control valves, and operating a cold system under full load puts unnecessary strain on seals and components.
During the warm up period, move the boom, stick, and bucket through their full range of movement at low speed to circulate warm oil through all circuits. Check that all movements are smooth and responsive before beginning work.
Positioning the Machine
Positioning the excavator correctly before digging begins is one of the most productivity critical decisions in excavator operation, and one of the most frequently underestimated by inexperienced operators.
Position the machine so that the digging area sits comfortably within its working range rather than at full reach. Working at maximum reach reduces digging force and increases cycle time, while working too close requires frequent repositioning.
Position the machine so that the truck or spoil pile is as close as practical to the digging position, keeping the swing angle small. The swing to and from the dump point is one of the largest parts of each digging cycle, so every unnecessary degree of swing reduces the machine’s hourly output.
Position the undercarriage so that the drive sprockets are at the rear of the machine, away from the digging face. If the machine must travel into the excavation or near the edge of the cut, the sprockets to the rear orientation provides better protection to the more vulnerable sprocket components.
Confirm the ground conditions at the machine position, including bearing capacity, distance from excavation edges, overhead hazards, and underground services, before beginning work. Positioning an excavator on inadequate ground, too close to an unsupported excavation edge, or beneath an overhead power line are among the most dangerous errors in excavator deployment. The same ground assessment principles apply to cranes and other lifting plant, as covered in Lifting Equipment Safety Tips for Safer Worksites.
The Basic Digging Cycle

The excavator’s digging cycle has four phases: loading the bucket, swinging to the dump, dumping the load, and swinging back to the dig position.
- Loading the bucket
Lower the boom to bring the bucket to the dig level. Curl the bucket out (open) and push the stick away to position the bucket at the start of the cut. Lower the boom to engage the bucket teeth with the material. Pull the stick back toward the machine while simultaneously curling the bucket in, this combination of stick and bucket movement fills the bucket in a smooth, controlled arc. As the bucket fills, raise the boom to maintain ground engagement pressure without dragging the teeth below the cut grade.
A productive digging technique is smooth and continuous, the bucket fills progressively as the stick pulls back and the bucket curls in, without jerky movements or sudden changes in direction that shock load the hydraulic system and the machine structure. Operating the machine smoothly also reduces fuel consumption and slows the rate of hydraulic component wear.
- Swing to dump
Once the bucket is full and curled in, raise the boom slightly to clear the excavation edge and slew the superstructure toward the dump position, truck body, spoil pile, or stockpile. Slewing and boom raising can be performed simultaneously to reduce cycle time.
- Dumping
Position the bucket over the dump point and curl the bucket out to release the load. On truck loading, the bucket should be positioned with the cutting edge over the truck body before dumping, dropping material from excessive height damages the truck body and creates dust. Lower the bucket progressively to minimise drop height.
- Return swing
Slew back to the digging position simultaneously with lowering the boom to the next cut level, the return swing and boom lowering can be performed concurrently to minimise cycle time.
The excavator’s digging cycle is the fundamental production unit. The number of cycles per hour, together with the machine’s payload per cycle, determines its hourly output. Minimising cycle time through correct positioning, smooth operation, and concurrent movements is the primary driver of excavator productivity, and choosing the right bucket for the material matters just as much, as explained below.
Also read: Types of Excavator Buckets and Their Uses Explained
Travelling on Site
Excavator travel, moving the machine from one position to another on the site, must be performed with the boom, stick, and bucket in the correct travel position: boom raised to provide ground clearance, stick curled in toward the machine, bucket curled in to minimise the forward projection of the working arm.
Travel with the boom low and the stick extended significantly raises the machine’s centre of gravity and forward weight bias, reducing stability and increasing the risk of tipping on uneven ground.
On slopes, travel up and down, not across the slope, whenever possible. Traversing a slope with a tracked excavator risks the machine sliding sideways and potentially rolling if the slope exceeds the machine’s rated traversing gradient. When digging must be conducted on a slope, position the machine to face up or down the slope rather than across it.
Approach road crossings, pipe crossings, culverts, and other buried structures with caution, the machine’s tracked undercarriage generates high ground pressures that can damage structures not designed for its weight.
Use a banksman, a ground worker positioned where they can see clearly and communicate with the operator, when travelling in areas with restricted visibility, near pedestrians, or in reversing manoeuvres. The excavator’s blind spots are significant, particularly directly behind and to the sides of the undercarriage, and a banksman is the most reliable control for preventing contact incidents with ground personnel.
Working Near Excavation Edges
Working at the edge of an excavation, the most common operational position for a trenching or basement excavation, requires specific awareness of the risk of edge failure and machine instability.
The excavator imposes significant load on the ground beside the excavation through its tracks. This load, combined with the force of the bucket cutting into the excavation face, can cause the edge to shear and fail, taking the machine with it into the excavation. Keep the tracks well back from the edge, at a distance set by the temporary works design or a competent person for the actual ground conditions, and never assume that an edge which looks firm will stay that way under the weight of the machine.
The bucket, when extended at depth below the machine’s track level, generates upward lift forces on the undercarriage if the bucket is used for breakout at full reach. Limit breakout force at depth and at maximum reach, use the machine’s weight conservatively rather than trying to generate maximum bucket breakout force in a marginal stability position.
Shutdown Procedure
At the end of the shift, or whenever the operator must leave the machine, follow the correct shutdown procedure:
Park the machine on firm, level ground where possible. Lower the boom, stick, and bucket so that the bucket rests flat on the ground with no load on the hydraulic cylinders. Allow the engine to idle for a short period before shutdown, as the manufacturer recommends, so the turbocharger can cool. Stopping a hot turbocharged engine immediately after heavy work can damage the turbocharger bearing.
Switch off all electrical loads, then shut down the engine. Confirm all controls are in the neutral position. Lock the cab. If the machine is to be left unattended on a public site, apply any additional security measures required by the site security plan, key removal, locking pins, or ground locking.
Key Excavator Safety Rules Every Operator Must Follow

- Confirm underground services before digging
Before the first bucket enters the ground at any new location, the locations of all underground services, gas pipes, electricity cables, water mains, telecommunications cables, must be confirmed from records and by a cable avoidance tool (CAT) survey. A service strike can be fatal and is the most serious risk in excavation work.
- Maintain exclusion zones around the machine
The excavator’s slew arc sweeps a large area during normal operation. No person should be within the machine’s maximum slew radius during digging or loading operations. Exclusion zones must be physically demarcated and enforced, verbal instruction alone is not adequate.
- Never lift people with the bucket
The excavator bucket is not a personnel carrier. Lifting a person in the bucket, even briefly and even at low height, is prohibited under workplace safety rules. For personnel access at height, a dedicated aerial work platform is the correct solution, and the main types are compared in Types of Aerial Work Platform and Their Common Uses.
- Respect rated lifting capacity
When the excavator is used for lifting, picking up precast elements, pipes, or other materials with a hook or lifting attachment, the machine’s rated lifting capacity at the relevant boom angle and radius must be confirmed before the lift. Lifting beyond rated capacity risks machine overturn. The load chart principles that apply to excavator lifting are directly comparable to those that govern crane operations.
- Maintain safe distances from overhead power lines
Excavator boom and stick movements can bring the working arm into contact with overhead power lines without the operator realising the risk. Safe clearance distances must be confirmed and enforced before any excavator operation near overhead lines.
Excavator types, from crawler and wheeled machines to mini, long reach, and specialist variants, each bring their own operating considerations, so operators should always be familiarised with the specific machine and its attachments before starting work.
Operate with Skill, Operate with Safety
Choosing the right machine for an excavation job starts with a clear picture of the work. When you contact the team, it helps to describe the type and depth of excavation, the ground conditions and access route, the space available around the machine, and how long you expect the work to take. With these details, the right equipment can be recommended from the start rather than adjusted after delivery.
RR Machinery Pte Ltd supports Singapore’s construction and industrial sectors with reliable heavy machinery solutions tailored to your specific site conditions. Browse our complete heavy machinery services or contact our team today for practical advice on the right equipment for your project.